Automated warehouses face a fundamental trade-off between maximizing storage density and achieving high retrieval throughput. While puzzle-based storage (PBS) architectures increase capacity by eliminating aisles, coordinating multiple robots in these high-density spaces is computationally challenging. This paper formalizes the challenge through a novel multi-robot problem formulation for ordered storage and retrieval: We consider rectangular 2D grids, where uniform-sized loads are first stored, up to full capacity, and subsequently retrieved according to prescribed arrival and departure sequences. The main contribution of this work is an online prioritized multi-agent path planning algorithm for this problem. The algorithm builds on prior work that constructs arrangements supporting sequential storage and retrieval, i.e., of one load at a time, without relocating loads. By exploiting the structural invariants of such arrangements, we achieve the scalability of decoupled planning while guaranteeing complete, deadlock-free parallel execution even at full storage density. Experiments demonstrate that the algorithm achieves near-linear improvement in makespan with respect to the number of robots, up to C robots, where C is the width of the grid's open side. Furthermore, the algorithm supports robust storage arrangements that accommodate bounded uncertainty in the departure sequence, with negligible impact on execution makespan.
Complete, Scalable, and Robust Prioritized Planning for Multi-Robot Ordered Storage and Retrieval at Maximum Capacity
Automated warehouses face a fundamental trade-off between maximizing storage density and achieving high retrieval throughput. While puzzle-based storage (PBS) architectures increase capacity by eliminating aisles, coordinating multiple robots in these high-density spaces is…
- Preview

- Year
- 2026
- Hosting
- Full text hostedCC-BY-4.0
Cite
Notes
Only stored in your browser.
Attribution
- Abstract & full text
- arxiv.org/abs/2608.07734CC-BY-4.0
- TL;DR
- Semantic Scholar